中文Contact Us

  • Overpass Construction over Changsha Electrolux Avenue Com...

    [2020.09.22]

    The photo, taken on September 20, shows the newly-completed overpass over the Electrolux Avenue, which is part of the Furong Avenue Upgrading Project Changsha Section. The conditions for opening to traffic of this two-way six-lane overpass have been met now. It is 317 meters long and 24 meters wide. It is a key non-railway construction part.

  • Fully Self-service Customs Clearance Available at Changsh...

    [2020.09.11]

    The Changsha Huanghua International Airport (hereafter referred to as “Changsha airport”) announced on September 10 that, Changsha airport customs clearance capacity upgrading project has passed the acceptance check and completed trial operation. It was put into official operation that day. This means that fully self-service customs clearance is available at the airport now.

  • Main Bridge over Beijing-Guangzhou Railway to Be Completed

    [2020.09.08]

    The Electrolux Avenue is a main east-west road of Muyun Area in the southern part of Changsha. The avenue’s west extension project is a railway-related one. The main bridge over the Beijing-Guangzhou Railway, undertaken by the Third Engineering Co., Ltd. of China Railway 25th Bureau Group, is a key and difficult controlling part of the project.

  • Changde-Yiyang-Changsha High-speed Railway’s Longest Tun...

    [2020.09.01]

    The Gongjiacun Tunnel, with a length of 1608.49 meters, was drilled through on that day, after over 13 months of tunneling work. It is expected to be fully completed by mid-October.

  • Changsha-Yiyang Expressway Expansion Project Opens to Tra...

    [2020.09.01]

    Secretary Du announced that the expansion project was officially opened to traffic, and the Liling-Loudi Expressway Expansion, Yuanling-Chenxi Expressway, Baiguo-Nanyue Expressway, Yongzhou-Lingling Expressway, Luhongshan-Cili Expressway, and Sangzhi-Longshan Expressway projects started construction simultaneously.

  • Changsha Dongjingpu-Zhuzhou Intercity Highway Opens to Tr...

    [2020.08.31]

    The Changsha Dongjingpu-Zhuzhou Intercity Highway, one of the three trunk highways planned in the Changsha-Zhuzhou-Xiangtan City Cluster construction, was opened to traffic on August 28. This reduced the travel time between Changsha and Zhuzhou to 28 minutes.