中文Contact Us

HOME>  News>  Local

Tunnels of Hexi section of Metro Line 4 to connect before Spring Festival

Updated: 2018-01-18


In the early morning of Jan 16, as the “Pioneering” NO.12 shield machine finished the excavation at Chazishan Station of Changsha Metro Line 4, the double tunnels from Fuyuan Bridge West Station to Chazishan Station of the first-phase project of Changsha Metro Line 4 connected smoothly. So far, the three stations and four sections, constructed by China Construction Third Engineering Bureau Corporation Limited were fully connected, laying foundation for the tunnel connection of Hexi (western Xiangjiang River) section of phase 1project of Changsha Metro Line 4 before the Spring Festival. Changsha Metro Line 4 is expected to be completed and opened to traffic by the end of this year.

 


On Jan 16, the double tunnels from Fuyuan Bridge West Station to Chazishan Station of phase 1 project of Changsha Metro Line 4 connected smoothly.[Report by Wang Zhiwei and photo by Dong Zhiqi, Changsha Evening News]


Source: Changsha Evening News
By: Huang Xiaoqin